As part of the extension of the historic Vorwerk facility in France, RCR installed 6,000 m² of resin flooring using the Rinol Allrounder STD system.
This multilayer coating was chosen for its mechanical strength and durability, ensuring long-term performance in a demanding industrial environment.
The project was marked by a high-quality finish, fully aligned with Vorwerk’s renowned quality standards.