Sodimac
Funza Cundinamarca, Colombia
- Industry Warehousing
- Building Warehouse
- Engineer Ing. Diego Fernando Solanilla
- Main Contractor Constructora Parque Central
-
Flooring Application
Rinol Pisocreto
- Partners Involved
Holcim (concrete)
-
RCR Products
Qualiroc Neutral (5kg/m2)
Permaban Eclipse, 3.467m
- Date of Completion 4th May 2015
- Technical Notes
High flatness required. Two areas with the following flatness worked: Area 75 Area VNA Fmin Jointless Large Bay, FF45 and FL40. Concrete floor MR40 , e = 20 cm quartz includes hardener 5kg / m2. There were changes in initial set temperature , 20 ° C at noon, 5 ° C at night early.